$225 million for Port Infrastructure Development Program (PIDP) - Due Soon

To improve facilities within, or outside of and directly related to operations of coastal seaports, inland river ports, and Great Lakes ports. Eligible projects for PIDP grants shall be located either within the boundary of a port, or outside the boundary of a port and directly related to port operations or to an intermodal connection to a port. Eligible projects are limited to: a. port gate improvements b. road improvements both within and connecting to the port; c. rail improvements both within and connecting to the port; d. berth improvements (including but not limited to docks, wharves, piers, and dredging incidental to the improvement project); e. fixed landslide improvements in support of cargo operations (such as silos, elevators, conveyors, container terminals, Ro/Ro structures including parking garages for intermodal freight transfer, warehouses including refrigerated facilities, lay down areas, transit sheds, and other such facilities); f. utilities necessary for safe operations (including but not limited to lighting, stormwater, and other such improvements that are incidental to a larger infrastructure project); or g. a combination of activities described above. Projects addressing environmental mitigation measures, freight intelligent transportation systems, and digital infrastructure systems are eligible if those components support one of the eligible project types listed above. This program will not fund construction, reconstruction, reconditioning, or purchase of a vessel, nor any project within a small shipyard


Applications must be submitted by 8:00 p.m. E.D.T. on May 18, 2020.


Do you need a review of your application? Contact us soon!



0 views
NWBOC logo denoting that Grant Managment Associates is WOSB Certified

© 2009 - 2020 Grant Management Associates.
All Rights Reserved.

  • Facebook - Black Circle
  • Twitter - Black Circle
  • LinkedIn - Black Circle